Schlumberger
  • Home
  • Products
    • MWD/LWD/RSS/GSD
    • Coiled Tubing Drilling
    • Openhole Wireline Logging
    • Formation Sidewall Coring
    • Pressure Test & Sampling
    • Microseismic Monitoring & VSP
    • Engineering Logging
    • Well Engineering Equipment
    • Production Logging System
    • PI View Software & Logging Analysis
  • Services
    • Wireline Service
    • MWD/LWD/RSS/GSD Service
    • Coiled Tubing Drilling Service
    • Logging Analysis & Reservoir Research
    • Perforation/Cutting/Completion
    • Equipment Rental / Technical Supporting
    • Cooperation Service
  • Catalogs
  • Cooperation
    • Services Cooperation
    • R & D Cooperation
    • Join Us
  • About Us
    • Contact Us
    • Certificate
    • About Us
    • Market
    • Partner
  • Language
    • English
    • 中文
    • Español
    • русский
You are here: Home > Tubing Conveyed Perforation (TCP) Operation in Afghanistan
Successful VSP Job
Logging-While-Fishing (LWF)
4.75 in. LWD FULLSET (MWD/GR/Resisitivity/Neutron/Density) services continue drilling 1043 m in Middle East
A Successful Wireline Well Testing & Sampling Job
Formation Testing TLC job under tough situation
Downhole Tractor Record
RSS/LWD operation in Daqing Oilfield, China
LWD Records
Walkaway job by SlimVSP
Wireline Pipe Conveyed Large Size Mechanical Sidewall Coring Job
8588 m Asia Logging Record
A series of successful jobs for National Day 70th Anniversary (September 30 to October 6)
Microseismic Fracturing Monitoring in Daqing Oilfield
Micro-seismic Real-time Monitoring
Microseismic monitoring by MagnetVSP in hot dry rock well
Reservoir Characterization Tester successfully operated with pipe conveyed logging in Middle East
Print

Tubing Conveyed Perforation (TCP) Operation in Afghanistan

On March 28, 2020, Geo-Vista had successfully finished TCP and Back-off operation in Shibirghan, Afghanistan.


© 2015 - 2023 All rights reserved. 京ICP备15009864号-1 | 京ICP备15009864号-2